  1. Arrow Maximum material transfer per hour through vacuum

    Hi

    Anyone please tell me, how much material can be transferred through vacuum...
    I want to transfer 100 Tons of material to the 5m height silo within 1 hour.

  2. #2
    Teus Tuinenburg

    Professional Experience 55 Years / 5 Month Teus Tuinenburg has 55 Years and 5 Month professional experience

    Discussions 220 Teus Tuinenburg acceded to 220 discussions, Publications 0 Teus Tuinenburg Tuinenburg released 0 publications

    Know-How Conveying (1488) Teus Tuinenburg used this tag 1488 times, Pneumatic Conveying (1278) Teus Tuinenburg used this tag 1278 times, Pneumatic (571) Teus Tuinenburg used this tag 571 times

    Dear Mohan P.

    You have placed this thread in the "Dust Control & Suppression" chapter of this Forum.

    Have you read the threads in the "Pneumatic Conveying" chapter?

    There you will find your answer.
    Teus

Similar Threads

  1. Always on Top: First Demag Cranes for Automatic 24-hour Operation in Refuse Incine...
    By drottboommarcel in forum bulk solids handling - Vol. 28 (2008) No. 1
    Replies: 0
    Last Post: 18th September 2018, 11:17
  2. Flow of Bulk Solids Through Transfer Chutes of Variable Geometry and Profile (A.W....
    By drottboommarcel in forum bulk solids handling - Vol. 1 (1981) No. 4
    Replies: 0
    Last Post: 7th August 2018, 15:18
  3. Transfer through Chute
    By faroq07 in forum Solutions for Screws, Segregation & Solids Flow
    Replies: 10
    Last Post: 26th May 2005, 5:53
  4. 15 tons/hour Cement Transfer
    By jason wang in forum Pneumatic Conveying
    Replies: 25
    Last Post: 21st February 2004, 5:17

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO