Results 1 to 2 of 2

Thread: Used automated towing systems

  1. Thumbs up Used automated towing systems

    Greetings Forum Friends
    We are pleased to offer the following very low hour AUTOMATED TOWING SYSTEMS for sale:
    -(6) 50,000 pound capacity, towing tugs
    -(16) Trailers....5'x11'
    All Wireless or Wire Guided.
    Please feel free to contact us for additional information.
    Sincerely,
    Al Goodmundson
    Phone Canada (306) 664-7260
    Email norsequip@sasktel.net

  2. #2
    Join Date
    May 15
    Posts
    4

    Maintenance and Overhaul for Glass Furnace

    The reasonable operating system of glass furnace is an important guarantee for prolonging the service life of the furnace and obtaining the high quality products. The operation of the furnace must be carried out strictly in accordance with the procedures prescribed by the process.

    When the furnace is put into operation, we must always pay attention to the maintenance. This can not only prolong the service life of glass furnace, but also improve the quality of the glass. Not only the reasonable design and good construction for glass furnace can prolong the service life of glass furnace, if you pay more attention to strengthen the maintenance inspection, and make it to be included in the regular operation specification, the service life of glass furnace can be extended to 20%~30%.

    It is an important work to inspect the whole furnace in a regular time (e.g., weekly or monthly). Roughly estimate the erosion of breast wall, screen wall, side wall brick, bottom brick(fused cast AZS brick) and checker brick, observe the expansion and cracking of various parts of the furnace, and do a detailed inspection record, which is helpful to analyze the damage degree of different parts of the furnace and take measures in time to repair.

    The system network technology is used to compile the detailed plan of the overhaul. Determine the date for the release, the end of the discharge, the date of stopping the furnace to cool and the beginning time to detach the furnace. Formulate the work schedule and personnel of the various parts of the kiln body. During the preparation of construction schedule, the material and various tools during overhaul plan is also needed to prepare. Formulate plans for the development of safety and labor protection products.

Similar Threads

  1. NBE Automated BMH System
    By Author in forum Product Presentations
    Replies: 0
    Last Post: 24th March 2013, 17:19
  2. NBE's Automated Handling & Packaging
    By Author in forum Product Presentations
    Replies: 0
    Last Post: 31st August 2012, 16:35
  3. Automated Bag Handling by NBE
    By Author in forum New Products, New Orders
    Replies: 0
    Last Post: 22nd August 2009, 15:38
  4. Automated Sampling
    By Author in forum Company News
    Replies: 0
    Last Post: 2nd September 2007, 19:37
  5. Automated Load Out
    By Todd Dietrich in forum Weighing, Dosing & Proportioning
    Replies: 6
    Last Post: 21st July 2006, 0:51

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO