    Cost comparison - conveyor vs hauler

    Are there general rules in regards to distance and tonnes per hour when comparing costs of running conveyor (s) instead of hauling with either road train, belly dump or rear dump. Or does each case have to be considerered individually? Have any studies been carried out on this topic?

    Cheers

  2. #2
    George Baker

    George Baker

    Vice President- Corporate Communications

    Assinck Ltd. [eDir]

    Assinck Ltd.

    Professional Experience 39 Years / 0 Month George Baker has 39 Years and 0 Month professional experience

    Discussions 883 George Baker acceded to 883 discussions, Articles 0 George Baker wrote 0 articles, Publications 0 George Baker Baker released 0 publications

    Searching nothing specified

    Know-How Screening (373) George Baker used this tag 373 times, Manufacturer (110) George Baker used this tag 110 times, Conveying (28) George Baker used this tag 28 times

    cost comparison

    this topic has been and is highly investigated, reviewed and cost analogies have been done to confirm the economies of using mining haul truck and the cost of drivers, benefits, etc vs conveying the material from the face.

    Generally, any time we can eliminate MAN POWER, we eliminate wages, vacations, benefits, problems with sick days, fluctuating operating costs due to varying degrees of experience, capital cost of new trucks, varying costs of ever changing haul distances due to moving distance of ROM face.

    Track mounted primary crushing or screening equipment is the craze now and proven to eliminate much costs at the face and feeding their processed material directling onto a long feed conveyor is becoming and is very popular now.

    kind regards......
    George Baker

  3. The cost comparative analysis is done as per usual rules / methods of cost comparison, which is not necessary to described here. This will be partially affected by locality and country.

    The choice of equipment and cost comparison for material transport can be broadly divided into two types of situations.
    A) Cross country direct transport from one point to other point
    B) Material transport in mining operation, etc.

    For serial number A, the owner will just have choice mainly based on cost comparison. However, this will be very much affected by availability of land, disturbance to the environment or surrounding people.
    For serial number B, the choice depends upon viability of the transport in the mining / equal situation. So, here apart from the cost, the feasibility of using either type of arrangement will also be dominant.

    It has been observed that choice is also affected by the liking of concerned people. For example, in some countries people prefer belt conveyors more whereas at other places there is more tilt towards truck haulage. Thus some people give more weightage to the particular advantage whereas some people give more weightage to the others advantage i.e. sensitivity to particular aspects.

    Regards,
    Ishwar G Mulani.
    Author of Book : Engineering Science and Application Design for Belt Conveyor.
    Email : parimul@pn2.vsnl.net.in
    Tel.: 0091 (0)20 5882916

  4. #4
    Lawrence K. Nordell

    Lawrence K. Nordell

    President and CEO

    Conveyor Dynamics Inc. [eDir]

    Conveyor Dynamics Inc.

    Professional Experience 57 Years / 11 Month Lawrence K. Nordell has 57 Years and 11 Month professional experience

    Discussions 2608 Lawrence K. Nordell acceded to 2608 discussions, Articles 0 Lawrence K. Nordell wrote 0 articles, Publications 0 Lawrence K. Nordell Nordell released 0 publications

    Searching nothing specified

    Know-How Design (1521) Lawrence K. Nordell used this tag 1521 times, Pipe Conveyor (238) Lawrence K. Nordell used this tag 238 times, Chutes (119) Lawrence K. Nordell used this tag 119 times

    A Few Subjective Comments:

    There are many conditions that weigh the financial and risk based results. A few points are:

    1. Civils:

    a) Cut and Fill for overland, incline or decline conveyors will favor belts beyond 1 km in length.

    b) Greater the slope (>10%) the more likely the conveyor will beat the truck. Maintenance of roadways can cause significant cost to project.

    c) Heavy rains impact road design and maintenance. These point have a small impact on well engineered conveyors. Poor soil favors conveyor over truck. T

    d) The class of engieered soil can further favor the belt.


    2. Curved Path - routing around obstacles with horizontal radii > 800 m for conventional belting and >200 m radii for pipe conveyors will favor belt conveyors.


    3. Tonnage -- > 5MMTpa will usually favor belts.


    4. Operating costs - improvements in belt rubber compounds continue to reduce belt operating costs. Thus, power efficiency for belts of all sizes continues to advance, whereas truck efficiency is only seen to increase with larger handling scale (ie greater tons handled).


    5. Truck Advantage

    a) Greater advantage is seen by trucking when there is a need for increasing dynamic allocation of truck fleet as mine plan changes over time.

    b) Breakdown replacements can be contracted and may be of short duration allowing to keep stockpile sizes to a minimum.


    A Monte Carlo transportation system simulation would give further evidence to the financial benefit and risk assessment of belt vs truck or visa versa.

    Lawrence Nordell
    Conveyor Dynamics, Inc.
    www.conveyor-dynamics.com

  5. conveyor versus hauler comparison

    In regard to your posting the rule is cost per ton mile to determine overal cost. this means you must determine all costs
    in a simulation and divide it by the haulage length. then you can get a good idea of the costs but you must get all of the information first!!!!!!!!!!!!!!!!!!!!!
    You do not mention conveyor size as in capacity wanted, length of haul route, length of the return route, electricity costs and labor costs, not to mention cost per hour of overhead- a 36 inch conveyor will run $2,000,000.00 per mile so you must take into account, electricity to run it, installation costs is it cable supported or steel supported? what is the grade of conveyor belt needed?,
    are emergency stops required or or they standard equipment?
    Transfer points are another issue, a 36 inch belt usually has a transfer point anywhere from 1500 to two thousand feet depending on slope, material weight, run of mine ore size etc.
    The big thing is friction, as you are creating huge amounts of friction on both the out bound leg and return legs of a belt line and the electric motors and reduction gears are pulling against all that weight just to run. splicing is another big issue, do I want to use mechanical splicing or vulcanized? the mechanicals cost less
    but the vulcanized splices are the best.... I would be glad to help you with this if you like -contact me at lzaharis@lightlink.com

  6. Comparison Hauler vs Conveyor

    In January 2004 a colloquium was held at University of Clausthal, Germany.

    One lecture was about the topic: economical comparison of continous and discontinous transportation in open pit mine Eagle Bute, USA.

    Lecture was held by Dipl.-Ing. Edmund Kppen and Dipl.-Ing. Michael Schtze, both RAG Coal International AG, Essen, Germany.

    I think a copy of the lecture is available from them.
    Stephan Obser
    Voith Turbo GmbH & Co. KG
    Start-Up Components
    Fill-Controlled Couplings
    Germany
    www.startup-components.com

  7. #7
    Mike Albrecht Guest
    Some quick rules of thumb:

    If the haulage distance will remian fixed at both ends for an extrended period of time (months at least, years peerferably) then a continuous system will usually be lower operating cost.

    If one end or both ends are moving regularly (hours, days, weeks) then a discrete hualage is needed.

    When a discrete haulage system starts to need additional units to maintain capacity, the option of converting at least part of it to continunous should be looked at.

    Hope this helps.

Similar Threads

  1. Belt Conveyor Cost Breakdown
    By S.M.SUBRA in forum Trough Belt Conveying
    Replies: 4
    Last Post: 26th November 2014, 3:13
  2. Pipe Conveyor Investment Cost / Noise Emissions
    By peter.eysel - RWE in forum Pipe Belt Conveying
    Replies: 24
    Last Post: 4th April 2005, 6:57
  3. Cost of Amylograph
    By fapeabah in forum New Projects, Tenders, Inquiries
    Replies: 0
    Last Post: 17th February 2005, 13:18
  4. Cost of Seaport Operation - Cereals
    By PRODEX INT'L in forum Bulk Ports & Shipping
    Replies: 2
    Last Post: 5th November 2004, 21:07
  5. Low Cost Navigation and Marine IT Products
    By Author in forum Company News
    Replies: 0
    Last Post: 27th July 2002, 12:05

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO