Dear Sir,
Choosing between 40 to 80 primary increments for this 60000 mt lot depends on the ores quality variation. A classification of the quality variation is given in Table 2 of the ISO 3082 standard.
Primary sample masses then are divided using either continuous or batch basis division (continuous being divison of each individual increment and batch being division of partial or sub samples). Minimum number of cuts is 4 for individual increments and 10 for partial samples. The complete primary sample mass can also be divided. In this case minimum number of cuts per gross sample is 20.
Tables 5 and 6 of the standard also supply suggestions of minimum divided sample masses for size and chemical/moisture determination.
If you need further information, or help in defining a suitable sampling protocol, please contact me. I have extensive experience with iron ore samplng applications and was a member of the Brazilian commitee analyzing the ISO 3082 family of standards. My contact information is below.
BRGDS,
Ricardo R. Herzog
Product Manager Samplers
Heath & Sherwood (1964) Ltd.
Tel.: +1-905-275-2906 ext. 26
Fax.: +1-905-275-3357
email: rherzog@heathandsherwood64.com
BRGDS,
Ricardo R. Herzog
Product manager Samplers
Heath & Sherwood (1964) Ltd.