    Fly ash rail car unloading

    Does any one have experience about rail car fly ash unloading, regarding compressed air characteristics, humidity, for winter weather northern Europe.? Is it required to have compressed dry air up to -40, -30,-20 °C dew point?

  2. #2
    Dennis Hauch - Freeport, TX, USA Guest

    Flyash Handling

    Corsa,

    I will speak from my fly ash handling experience on the Texas Gulf Coast where the humidity is always with us.

    The ideal handling system will be completely closed to the atmosphere. The railcar should be a closed (non-vented) type that will accommodate a dry air pad during transport, the pneumatic unloading system should be a closed-loop design, and the receiving hopper should also be closed.

    The air in the closed system should be monitored for moisture and maintained at a dewpoint that will assure the flowability of the flyash out of the railcar and out of the receiving hopper. Provide a pad / depad makeup for instrument quality air which has normally a minus 40 degree dewpoint.

    Even after all this it may still be necessary to provide a flow aid device, such as an air pad, on the railcar to get the material out.

    This is my experience.

    Regards,

    Dennis Hauch

  3. #3
    Peter Wypych

    Peter Wypych

    Professor and Engineer

    University of Wollongong [eDir]

    University of Wollongong

    Professional Experience 32 Years / 6 Month Peter Wypych has 32 Years and 6 Month professional experience

    Discussions 18 Peter Wypych acceded to 18 discussions, Articles 0 Peter Wypych wrote 0 articles, Publications 0 Peter Wypych Wypych released 0 publications

    Searching nothing specified

    Know-How Pneumatic Conveying (12) Peter Wypych used this tag 12 times, Filtration (1) Peter Wypych used this tag 1 times, Bulk Materials Handling (1) Peter Wypych used this tag 1 times

    You need to know min possible ambient temp inside/outside equipment. You also need to know max pressure inside equipment (where ash is present) - this will change dew point. The dew point of the supply air must be less than this min possible "operating" temp (under pressure/atm conditions) - otherwise condensation will occur.
    Regards
    peter_wypych@uow.edu.au

Similar Threads

  1. Ship Unloading
    By Scott Neidigh in forum General Aspects
    Replies: 10
    Last Post: 7th July 2004, 18:27
  2. Gate for Unloading Ore Bin
    By Author in forum New Projects, Tenders, Inquiries
    Replies: 1
    Last Post: 18th November 2002, 23:28
  3. Rapid load/ rail loadfout system
    By KS Dilip in forum New Projects, Tenders, Inquiries
    Replies: 0
    Last Post: 19th January 2001, 9:11
  4. Bulk Loading Systems - Ship Loading and Unloading
    By Duane A. Peck in forum General Aspects
    Replies: 4
    Last Post: 13th November 2000, 10:12
  5. Modelling of an Unloading Grab
    By Christopher Laning in forum General Aspects
    Replies: 0
    Last Post: 10th November 2000, 13:50

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO