Thread: Coal Mill Reject Conveying

  1. #1
    girish Guest

    Coal mill reject conveying

    Respected sir

    I am working on conveying coal mill reject of size approx below 40mm with a distance of 100- 130m to elevation of 12-13m.

    Is it appropriate to say that coal mill reject can be conveyed in dense phase.

    Would sholud be solid/air ratio,bulk mean velocity and conveying pressure for conveying mill reject.

    Any literature, if avaiable,may be please be informed.

    My email id : girishbhagchandani@bhelpem.co.in

  2. #2
    Dennis Hauch - Freeport, TX, USA Guest

    Coal Conveying

    Girish,

    Particle size distribution (PSD) is key to this application. If the PSD is wide, it is possible that dense-phase conveyance may work. If the PSD is narrow and the D50 > 20 - 25 MM, neither dense-phase nor dilute-phase would represent viable solutions. I would suggest that a test program undertaken with a global supplier such as Coperion-Waeschle or Zeppelin would establish the dense-phase conveying potential.

    Short of a pneumatic test program, it would seem that the coal would be an ideal candidate for a drag-disk conveyor. I would recommend Schrage Rohrkettensystem GmbH.

    Regards,

    Dennis Hauch

  3. #3
    Peter Wypych

    Peter Wypych

    Professor and Engineer

    University of Wollongong [eDir]

    University of Wollongong

    Professional Experience 32 Years / 6 Month Peter Wypych has 32 Years and 6 Month professional experience

    Discussions 18 Peter Wypych acceded to 18 discussions, Articles 0 Peter Wypych wrote 0 articles, Publications 0 Peter Wypych Wypych released 0 publications

    Searching nothing specified

    Know-How Pneumatic Conveying (12) Peter Wypych used this tag 12 times, Filtration (1) Peter Wypych used this tag 1 times, Bulk Materials Handling (1) Peter Wypych used this tag 1 times

    We have dense-phase conveyed sub 50 mm crushed coal quite successfully over such distances. However, the success does depend largely on consistency of coal size and moisture (as well as required tonnage rate). If these parameters can be controlled to acceptable limits, then you can dense-phase convey such materials. The largest dense-phase coal system that we have been involed with (design/test/optimisation) involved 40 to 50 t/h over 200 m with a 60 m lift.
    Regards
    peter_wypych@uow.edu.au

Similar Threads

  1. Steel & Cement Mill Parts
    By CH Ng in forum New Projects, Tenders, Inquiries
    Replies: 21
    Last Post: 12th August 2005, 6:10
  2. Saw Mill Drying Technology
    By Author in forum Drying Technology
    Replies: 6
    Last Post: 13th April 2005, 8:34
  3. Increasing Raw Mill Output
    By IMTIAZ in forum Silos, Hoppers, Bins, Bunkers & Domes
    Replies: 4
    Last Post: 27th February 2004, 9:11
  4. New 10 MW Voith Turbo Coupling Combination for Use in Mill & Fan Drives
    By Voith Turbo in forum New Products, New Orders
    Replies: 0
    Last Post: 13th May 2003, 9:03
  5. Wet Mill for Limestone Requirement
    By zhoumg in forum New Projects, Tenders, Inquiries
    Replies: 2
    Last Post: 8th May 2003, 19:43

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO