  1. Percentage proportion on conveyor system

    Dear Sirs,

    Is there any standard or guidelines for percentage of work share in conveyor system /projects. In normal practice the percentage of work share we assume as followsThough it varies case to case)
    Design and engineering approx 6-8%%, Material cost 60-65%, Conversion 10-20%, Installation - 10-24%
    Thank you in advance.
    s.m.subra





    Added by Adminstrator:

    Name:  images.jpg
Views: 235
Size:  4.3 KB

    Belt Conveyor Monitoring
    Last edited by Author; 26th November 2014 at 20:37.

  2. Dear Mr. Subra,

    I do not believe it is possible to arrive at a cost breakdown formula that is suitable for all conveyors, as there are too many variables. For example, the design cost for a simple relatively short troughed conveyor will be similar (possibly higher) to that for an overland conveyor -- and the material cost percentage and installation cost percentage will be higher for the overland system. Thus the design cost percentage for the overland system will be substantially lower than that for the short system. Likewise, two otherwise identical systems, except for a low cost belt versus a specialty carcass/cover belt will have dramatically different material cost percentages.

    Also, would you clarify what goes into your "conversion" cost category?

    Regards,
    Dave Miller
    ADM Consulting
    10668 Newbury Ave., N.W.,
    Uniontown, Ohio 44685 USA
    Tel: 001 330 265 5881
    FAX: 001 330 494 1704
    E-mail: admconsulting@cs.com

  3. Dear Sir,
    Thank you for your reply.
    The conversion cost i mean is for fabrication / manufacture cost
    Regards
    subra

  4. #4
    Join Date
    Nov 14
    Posts
    1

    Idler Roller Replacement

    Dear Sirs,

    I'm looking for information about idler roller replacement. What is the total yearly idlers replacement percentage of your company or bulk plant?

    The replacement is based on the condition or planning?

    Thank in advance,
    Regards,

    Victor Souza
    Mechanical Engineer
    Vale
    Vitria-ES, Brazil

  5. #5

    Start Again PLEASE

    Quote Originally Posted by Victor Souza View Post
    .....The replacement is based on the condition or planning?.....
    What's the difference? Conditions should match stockholding.
    If some firms give you this information they are exposing themselves to marketeering and review.
    Eg. nickel miners in New Caledonia go through rollers and belts so fast it is difficult to imagine how even the Chinese manufacturers can maintain supply. If the French parent companies were aware, perhaps they are now, there would be some very serious questions asked internally.

    Also examine your installation cost. Hacking out jungle and bridging rivers to push an overland through will take up most of the project CAPEX. In reality it is your CAPEX. On most overland conveyors the Civil people rule the roost, closely followed by Electrics, and rightly so. Accept what they say, design your mechanicals to suit and walk away. Replacement idler cost is insignificant. Even life cycle costing is a waste of time. Buy cheap or expensive it hardly matters when you can sell off the stored unused rollers at a higher price than you paid for them 5 years ago. That's life and there's always an easy solution.

Similar Threads

  1. Conveying Sugar on a Belt Conveyor
    By Scott Neidigh in forum General Aspects
    Replies: 6
    Last Post: 9th January 2006, 10:41
  2. Belt Conveyors(Steel v/s Nylon belt)
    By Rajesh Mendiratta in forum General Aspects
    Replies: 6
    Last Post: 1st April 2004, 14:28
  3. Book on Belt Conveyor Technology
    By I G Mulani in forum General Aspects
    Replies: 0
    Last Post: 13th November 2000, 14:44
  4. Conveyor Belt Technology book
    By I G Mulani in forum General Aspects
    Replies: 1
    Last Post: 13th November 2000, 14:20
  5. Finite element belt conveyor models
    By Alfredo Salinas in forum General Aspects
    Replies: 2
    Last Post: 10th November 2000, 16:04

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO