    P K Kulkarni - Mumbai, India Guest

    Leakages of coal along skirtboard

    During coal conveying from one feeder to another or one conveyor to another coal leakage takes place along skirtboard rubber edges. We've tried using different types of rubber pads of shore hardness, but due to errosion pads worn off and coal leakage starts. Any solution?

  2. #2
    Lawrence K. Nordell

    Lawrence K. Nordell

    President and CEO

    Conveyor Dynamics Inc. [eDir]

    Conveyor Dynamics Inc.

    Professional Experience 57 Years / 11 Month Lawrence K. Nordell has 57 Years and 11 Month professional experience

    Discussions 2608 Lawrence K. Nordell acceded to 2608 discussions, Articles 0 Lawrence K. Nordell wrote 0 articles, Publications 0 Lawrence K. Nordell Nordell released 0 publications

    Searching nothing specified

    Know-How Design (1521) Lawrence K. Nordell used this tag 1521 times, Pipe Conveyor (238) Lawrence K. Nordell used this tag 238 times, Chutes (119) Lawrence K. Nordell used this tag 119 times

    Yes, there are two concurrent solutions.

    First and best use a curved loading chute -see our website. This will reduced the pressure on the skirtboards to an acceptable level or make the skirtboard redundant.

    Second, you must take the pressure off the skirt rubber and this also assumes you have designed the proper idler support system at the loading impact area. To take the pressure off the skirt rubber you must have an inner chute liner/lip that keeps the product away from the rubber.

    Want further help call us.

    Lawrence Nordell
    Conveyor Dynamics, Inc.
    www.conveyor-dynamics.com
    email: nordell@conveyor-dynamics.com

  3. Automatic Skirt Rubber Adjustment

    I agree with Larry Nordell that curved loading chutes are the ultimate. Absent that yo need to have good belt support, proper wear liner design and most of all preventiive maintenace to stop leakage at transfer points.

    Visit our web site and look up BOCO Skirting. It is our latest system for sealing transfer points and it is self adjusting. www.martin-eng.com
    R. Todd Swinderman
    Martin Engineering Co.
    309-594-2384 x257

  4. Skirt leakage at transfer points

    I would suggest that detailed design attention be given to the transfer chutes on the following lines: -

    1. - Collect, focus and guide the material via a chute that is based on the contact friction value of the material on the chute surface to a narrow flow channel terminating at a velocity similar to the receiving belt speed.

    2. - Fit a flat skid plate under the belt at the recieving point, to avoid belt sag between rollers that tends to wedge fines under the skirt seal edges..

    3. - Use diverging side skirts over the receiving area, so that the product is carried away from the seal points. A deep bed with wide diverging skirts will allow the bulk to stabalise over the initial belt run. Inclining the skirts away from the belt run, instead of being vertical, may also relieve transverse pressures of the material against the seal contact point.

    I hope that these suggestions help.

    Lyn Bates

  5. #5

    Leaks of Coal along Skirtboard

    Dear Sir,

    Among othert good features, WEBA High-Tech transfers are designed to control material velocity and direction so that the load is transfered onto the outgoing belt without skirts. Check out their website at www.mjeng.co.za.

    Joe Dos Santos, PE
    Dos Santos International
    531 Roselane St NW
    Suite 810
    Marietta, GA 30060
    USA
    Tel: 1 770 423 9895
    Fax 1 866 473 2252
    Email: jds@ dossantosintl.com
    Web Site: www.dossantosintl.com

  6. Shri P K Kulkarni,

    In general, there should not be objectionable leakage of material at skirt-board. Even if there is some leakage, the leaking material would be conveyed ahead between skirt-plate / rubber and troughed belt, without spillage or any problem. If the material is fine powdery, then air extraction and dust collection unit will prevent material fuming leakage. The main reason for leakage will be :
    1) The belt tension under skirt board is not adequate. The belt tension shall be such that the belt sag between impact idlers (or other idlers at skirt board) should be less than 2.5mm, in any operating situation i.e. whether starting, stopping, steady; and capacity from zero to full mtph.
    This value is at sag valley point. This point up/down level variation affecting sealing is likely to be less than 2mm. Sealing gap average value along length will be much less.
    2) If the feeding point is located above sharply inclined portion of conveyor, the material will not pick-up speed quickly, resulting in material build-up height directly below feed chute, and consequent higher pressure and leakage.
    3) The idlers should be spaced very closely 300 to 450 mm in accordance with belt tension.
    4) The transition distance and belt profile should be such that the belt steadily rests on idlers all the time, and does not raise-up or lower.

    Regards,
    Ishwar G Mulani.
    Author of Book : Engineering Science and Application Design for Belt Conveyors.
    Email : parimul@pn2.vsnl.net.in
    Last edited by I G Mulani; 24th February 2003 at 12:28.

Similar Threads

  1. China Coal Research Inst, Coal Preparation
    By coalpreparation in forum Associations, Institutes & Societies
    Replies: 1
    Last Post: 20th January 2010, 6:24
  2. Skirtboard Friction Factors, CS
    By lowraxe in forum Flow Properties
    Replies: 1
    Last Post: 22nd September 2009, 20:29
  3. Improved Skirtboard Sealing
    By Author in forum New Products, New Orders
    Replies: 0
    Last Post: 26th January 2009, 11:33
  4. Coal Tailings, 30% Coal Content, West Coast Canada
    By Steve-L in forum General Aspects
    Replies: 3
    Last Post: 16th May 2005, 15:24

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Single Sign On provided by vBSSO